Certified Course · 2026
Back
Certification
Course: Analysis and Design of Confined Masonry Buildings with ETABS, SAP2000 and SAFE
Institution: GESCONVIAL S.A.C. (Gestión, Construcción e Infraestructura Vial)
Certificate ID: ESS-G1 · Issue Date: April 30, 2026 · Grade: 19/20
Duration: March 14 – April 08, 2026 (36 hours)
Verification: Scan QR code on physical certificate to validate authenticity.
Cajamarca
Location · Zone 3
0.85 kg/cm²
Bearing Capacity
Ing. Daniel O. Barrantes Guzmán · Instructor
GESCONVIAL S.A.C. · Training
Certificate ID: ESS-G1 · 19/20
Structural Materials
- Masonry: Hollow brick · f'm = 65 kg/cm²
- Concrete: f'c = 175 kg/cm² (confinement)
- Rebar: fy = 4200 kg/cm²
- X-direction walls: t = 0.13 m
- Y-direction walls: t = 0.23 m
- Tie beams: 0.14 x 0.35 m
- Tie columns: 0.14 x 0.40 m
Seismic Analysis (E.030)
- Seismic Zone 3: Z = 0.35
- Category: U = 1.0 (Common building)
- Soil Profile S3: S = 1.20
- Amplification factor: C = 2.5
- Period Tp = 1.0s · TL = 1.6s
- R = 3 (Confined masonry)
- ✓ Wall density X: 4.1% · Y: 4.6%
- ✓ Drifts < 50% of code limit
Structural Design (E.070)
- X-direction walls: MX-01 to MX-08
- Y-direction walls: MY-01 to MY-09
- Axial verification: Pm/(f'm·t·L) < 0.20 ✓
- Shear verification: Vload ≤ 0.55·Vm ✓
- Overstrength: Ω = 3.0
- Crack control: Fsuasto per E.070 ✓
Software Used
- ETABS v20: 3D modeling & seismic analysis
- SAP2000 v24: Verification & validation
- SAFE v16: Foundation design (Winkler model)
- Excel: Macros for wall density & load takedown
Course Modules
- M01: Introduction to Structural Masonry & Codes
- M02: Structuring Criteria & Pre-dimensioning
- M03: Load Takedown & ETABS Modeling
- M04: Static Seismic Analysis (E.030)
- M05: Dynamic Analysis & Verifications
- M06: Load-bearing Masonry Wall Design
- M07: Confinement Elements Design
- M08: Non-bearing Walls, Foundations & Closure
Foundation Design · Winkler Model
- Allowable bearing capacity: 0.85 kg/cm²
- Ballast modulus (ks): 3.13 kg/cm³
- Foundation depth (Df): 1.20 m
- Footing height (ht): 0.61 m
- Shear verification: D/C = 92.68% ✓ COMPLIES
- Ultimate moment (Mu): 7.23 ton·m ≤ Cracking moment (7.30 ton·m) ✓
- Transmitted stress: 0.47 kg/cm² < 0.85 kg/cm² ✓